×

We'll help you find the right contractor.

Share your project details and we'll reach out to Huber Construction so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Location

Use our bidding system to request a quote

Huber Construction Plumber

We are proficient in scheduling and managing your projects to stay on time and on budget. Our crew has managed over 1billion dollars in projects either for other companies or ourselves. You can count on us with whatever your needs may be. Architectural design and engineering are available through a design contract as well with certified professionals that we use and can count on.

From BuildZoom: Their BuildZoom score of 77 does not rank in the top 50% of Wisconsin contractors.

If you are thinking of hiring Huber Construction, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Huber Construction Contact Information

Phone: (815) 764-6431

Huber Construction Reviews
2 out of 5 stars, based on 5 reviews

  • By Tim R.
    August 25, 2022
    Kitchen remodel
    $15,000

    We hired Huber Construction for a kitchen remodel. We felt very comfortable with Chris at the start of the project, he is very personable and made us feel like he was the right person for the job. We were told it was a "small" job and would be done fairly quickly. The subcontractors they used were careless and broke a water pipe and damaged our water main into the house causing several hundred dollars to repair. The job ran behind schedule, contractor would only work half day and some days not at all. It took 5 weeks to have a workable kitchen. We still have punch items that haven't been completed (a year later).
    We started having issues with a sewer smell when we ran the garbage disposal or dishwasher. I called in a plumbing company only to find out that the pipes were installed to code. It cost an additional $1200 to fix their poor workmanship.

  • By Mark C.
    March 15, 2022
    Build a deck
    $39,000

    Signed a contract with Chris to build a deck. Materials such as fascia boards, stair riser boards, solar caps and stair lighting were never ordered and had to pay someone else to finish the deck and fix issues that had to be fixed.

  • By donnamensah
    December 30, 2021
    Build deck

    Hired Christopher Kyle Huber, operating as Huber construction company to build a deck in August 2021. Initially, things seemed to be moving along. Chris was very responsive to my inquiries and I felt comfortable working with him. I paid about a 1/3 of the cost for materials upfront that were delivered right away and are still on my lawn. I then paid another 1/3 at what was supposed to be the start of the project about a week later. The problem is that the project didn’t get started, the old deck was demolished, but nothing else happened. Called several times to see why the project wasn’t moving along and was given excuse after excuse. Finally, in November, after being given several start dates for work to begin and no one showing up, I called Chris and told him that I did not have confidence in his ability to complete the project. I was given the excuse that it was hard to find labor and no timeframe for when the project would get started. I decided that was enough and wanted to end the contract. I requested a refund of my money. He said that he would work on it, but never heard back from him. He owes me approximately $10,000! I have filed a lawsuit, but the Sheriff’s Office has been unable to serve him at his business location on Grand Ave in Fox Lake. Please do your due diligence before contracting with this company. Check licensure and not only google the company, but the owner. Do not make the same mistake that I did!

  • By Ken B.
    September 25, 2021
    Permit package
    $5,000

    I signed the design contract with Team Huber May 1st. and furnished them with a pdf document that contained our specific house plans with the understanding of working those plans into a format that was acceptable to the village. In order to finalize this permit set of drawings, we needed to decide some final details and this would be combined with the topographical survey and presented as a package with “hard numbers and was to include everything from pulling permits, city review charges, breaking ground costs, to final clean up and walk through, including materials, labor and project management services. “ My involvement was to make a $5000 payment and attend some meetings to work out the many variables and then after this process we would enter into the Construction Contract. Soon after joining Team Huber my wife and I realized that the communication network of doing business here seemed to be broken and reported our specific complaint which was minimized and shrugged off. We attended another meeting asking for status and whether our project was going to fall within budget at which time we received a hastily assembled outline with categories and prices that was $100K or 40% over budget and told that it will all come together once the results of the survey are in.
    An invoice showed up for architect services that were NOT consistent with our project as changes were made to the plans that we already liked and approved of, without our involvement, knowledge or consent. Then we got an invoice for the survey that did finally come about and expected the master plan to soon come together, but it did not follow, the momentum stalled. Here it is after 5 months and we still have not so much as seen the permit set of drawings, Team Huber is insisting we pay the additional invoices before they release the master plan package.
    I had no idea the initial planning and the work of obtaining a permit set of drawings and coming up with a budget would be costing more money and could be so elusive. I dread the thought of building with this contractor as I was expecting to receive something in exchange for my deposit at the signing of the design contract, yet it is being withheld on the premise that the 5K was spent already with the architect. I do not contest the direct cost of the topographical survey but have protested the architects freedom of expression translating into an overcharge. The contactors defense may be feasible on the surface but it is not professional and dubious if true. Team Huber did not honor the terms of their Design Contract with us or handle our objections very well in the process so for this reason I recommend you shop around.

    Read more
  • By Michael B.
    January 25, 2021
    Considered for Bath House/Comfort Station Renovation

    We decided to downsize the project and have our in-house maintenance do it.

Please write a review about Huber Construction
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.