Share your project details and we'll reach out to
Huntsman Daniel E
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Huntsman Daniel E at Point Reyes Station, CA 94956, held a Architect license (#C9255) with the California contractors license board with an expiration date of 08-31-2023. We last verified the license was expired on 10-16-2025.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
8th floor: tenant improvement includes non-structural demolish construction of non-structural partitions doors interior glazing ceiling light fixtures millwork and finishes. no cahnge in occupancy use or area. lifesafety & sprinklers under separate permit
Interior demolish and abatement of existing unoccupied 25th & 26th floors including non-structural partitions ceilings lighting plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy use or area. ab-017
4th, 7th & 10th floor demolition only of non-structural partitions doors, glazing, millwork, ceiling, lighting & finishes. no change in occupancy use or area. mep life safety & sprinklers under separate permit. ab-017
Speculative suite tenant improvement of an existing unoccupied site on a multi tenant floor. no change in occupancy use or area. for path of travel and restroom exhibits ref pa # 202011068441
Installation of (46) free standing phone booth furniture units work includes fire sprinklers (deferred) and life safety devices (deferred) work to be performed in spaces constructed under the following app # 2019-0826-9778 2019-0819-9110 2019-0819-9109
16th fl: non-structural demolish. (n) non-structutal partitions finishes plumbing fixtures & accessories. no change in area occupancy or use. mep l/s fire sprinklers under separate permit
25th fl. interior tenant improvement including new demising walls and renovations to existing restrooms and common corridor work includes demolish and construction of non structural partitions doors ceilings lighting mechanical and finishes. no structural
21st fl: int tenant improvement (e) off space. work incl non-struc demolish & addition of non-load bearing walls doors & refresh of int finishes. no struc work. no chg of occup. no chg of use. new air distrib in area of work with new heat pump. ref pa 202010015688. sprinkler/fire alarm under sep permits
2/f: non-structural demolish. new non-structural partitions door/frame/hardware millwork finishes. no change in occupancy use or area. mep included in the set. life safety and sprinklers under separate permit
7th fl: non-structural demolish. (n) non-structutal partitions finishes plumbing. no change in area occupancy or use. mep l/s fire sprinklers under separate permit
7th floor. interior tenant improvement. demolish fo restroom & elevator lobby. constructin of non-structural partitions ceilings casework & finishes. no change in occupancy use or area. mep life safety & sprinklers are under serparate permit
20th floor: non-structural demolish upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy use or area. mep life safty & sprinkler defered
Demolish of non structural partitoins doors millwork finishes electrical. new non structural partitoins doors glazing finishes electrical. mep deferred
10/f: interior t.i.: selective demolish and construction of non-structural partitions doors and sidelights ceilings lighting power millwork and finishes. no change in occupancy use or area
Non structural demolish. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy use or area. mep ls sprinlkers deferred
14th floor. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant floor incl interior selective non-structural demolish. no change in occupancy use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882
8th floor. demolish of non-structural walls plumbing and ceiling systems. construct (n) tenant partitions incl non-structural walls plumbing & lighting. mechanical electr plumbing life safety & sprinkler to be design-build under separate permits
According to the California Architect License Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Huntsman Daniel E at the California Architect License Board.
This is a sample of licensing data; click here to access a complete history.