Tear off and re-roof single family residence
Permit #:
2019-ROOFSIDE-0011475
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 1 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 2 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 4 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 5 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 6 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 1 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 2 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 3 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 4 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 5 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 6 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 1 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 2 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 3 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 4 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 5 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 6 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...
Installation of a 180,000 btu on-demand water heater and related gas piping in unit 1 (to replace an electric water heater.) gas schematic to be provided at rough inspection. no electrical work under the scope of this permit. ( existing "plug in" electrical water heater to be removed and there is a "plug-in" cord for the "on-demand" water heater.)
Building Type:
Multifamily Dwell...