Share your project details and we'll reach out to
John P Ingram Jr
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 93 ranks in the top 27% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring John P Ingram Jr, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Tenant improvement (1313 sf) otc - revision to 7/25/13 -2009 main st. - (e) exterior entry complies with ada. no power assisted required. otc - rev. to 13cbp0589 -replace wood posts with steel posts& saddles
Roof and floor repairs to existing building. no additional square footage added and no changes in use. total area of the building is 11, 286 on the ground floor where no new or repairs type of work is being done and 8, 000sf of 2nd floor area that is being repaired as well as the roof truss system. revision to 11cbp0121 - replace existing lighting in warehouse
Roof and floor repairs to existing building. no additional square footage added and no changes in use. total area of the building is 11, 286 on the ground floor where no new or repairs type of work is being done and 8, 000sf of 2nd floor area that is being repaired as well as the roof truss system
1427 4th st - renewal of plan check10pc1437 - four story office/retail building with two subterranean parking levels. ground floor (11, 543 sq. ft.) and upper floors (2nd = 12, 019 3rd = 11, 537 4th = 9, 076 sq ft.). total sq. ft. 44, 175. total parking sq. ft. 25, 200
Four story office/retail building with two subterranean parking levels. ground floor (11, 543 sq. ft.) and upper floors (2nd = 12, 019 3rd = 11, 537 4th = 9, 076 sq ft.). total sq. ft. 44, 175. total parking sq. ft. 25, 200
Renovation of social hall unitarian ( church ) revision 2/09/2010 ; revised location of steel post @ south wall and related details. revise type of sheer wall
Unit # 201-b. tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new double doors addition 2 new offices and open office area; 2, 321 sf of area effected.
Unit # 201-b. tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new double doors addition 2 new offices and open office area; 2, 321 sf of area effected
Unit # 202-c. tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new suite entry door addition 2 new offices and 1 new storage room; 623 sf of area effected
Unit # 202-c. tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new suite entry door addition 2 new offices and 1 new storage room; 623 sf of area effected
Unit # 200-a. tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new double doors 1 office and open office area; 2, 473 sf of area effected.
Tenant improvement -demolition of 6'-0 linear feet of existing wall to addition new double doors 1 office and open office area; 2, 473 sf of area effected.