J

Location and Projects

Address
Kansas City, MO, 00000
Use our bidding system to request a quote

John the Plumber

John the Plumber at Kansas City, MO 00000, has a BuildZoom score of 105 and ranks in the top 8% of 23,328 Missouri contractors.

If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.

John the Plumber Contact Information

Building Permits by John the Plumber

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-11-25
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
$0
Permit #:
PW-EXC-2025-02480
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-24
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02469
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-09-05
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02413
Status:
complete
Fee:
$420
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-23
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00988
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Gas test and reconnect residential
2025-03-19
Gas test only of existing installation. this permit is for inspection only; no new piping alteration or new plumbing work is included. if any work requiring a permit is found to be necessary for releasing the gas service a separate permit application shall be made and the permit application shall comply with all requirements for contractor licensing
Valuation:
N/A
Permit #:
CPPR-2025-00612
Status:
issued
Fee:
$52
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-11
No traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. if two-way directional traffic flow cannot be maintained contractor shall obtain traffic control permit via compass kc for work in roadway prior to performing excavation work. 3/4 dom svc repair @ curb (reg# 47202)
Valuation:
N/A
Permit #:
PW-EXC-2025-00963
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00681
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Gas test and reconnect residential
2025-02-24
Gas pressure test at 3300 askew. gas test only of existing installation. this permit is for inspection only; no new piping alteration or new plumbing work is included. if any work requiring a permit is found to be necessary for releasing the gas service a separate permit application shall be made and the permit applicant shall comply with all requirements for contractor licensing
Valuation:
$0
Permit #:
CPPR-2025-00443
Status:
issued
Fee:
$52
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-27
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00649
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Gas test and reconnect residential
2025-02-19
Gas test only of existing installation. this permit is for inspection only; no new piping alteration or new plumbing work is included. if any work requiring a permit is found to be necessary for releasing the gas service a separate permit application shall be made and the permit applicant shall comply with all requirements for contractor licensing
Valuation:
N/A
Permit #:
CPPR-2025-00293
Status:
complete
Fee:
$52
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-05
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00339
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-01-28
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00323
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-15
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00253
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-04-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00030
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Plumbing general - residential
2025-05-29
We opened slab and ran new drainage for 2 baths 1 kitchen. also ran vents and water for both bathrooms and kitchen. for an addition and remodel of an existing single family residence per plans reviewed for code compliance
Valuation:
N/A
Permit #:
CPPR-2025-00591
Status:
complete
Fee:
$84
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-10-13
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04718
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-02
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04713
Status:
issued
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-03
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04539
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Gas test and reconnect residential
2025-07-17
Gas test only of existing installation. this permit is for inspection only; no new piping alteration or new plumbing work is included. if any work requiring a permit is found to be necessary for releasing the gas service a separate permit application shall be made and the permit application shall comply with all requirements for contractor licensing
Valuation:
N/A
Permit #:
CPPR-2025-01814
Status:
issued
Fee:
$52
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-31
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03144
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # TC-0230
126
BZ Score
-
Avg Project
-
Projects

John the Plumber Reviews

BuildZoom hasn't received any reviews for John the Plumber. Click here to be alerted when reviews are posted about them.
Please write a review about John the Plumber
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.