Their BuildZoom score of 95 ranks in the top 22% of 128,670 Washington licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Lakewood Plumbing Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
New permit request to install new water main extension across addison st sw and abandon 2 service line on the east side of addison st sw and the south side of 127th st sw. work requires removal of a 10 x 6 section of city sidewalk & curbing on the east side of addison st sw and open cut across addison st sw for water main extension and a small window patch on the south east corner of ... see more
Emergency permit request. work required to repair broken 12 water main at the end of hemlock st at the end at the abandoned crestwood drive sw. work also requires the replacement of a section of the concrete turn around approach at the end of hemlock street
New permit request to install new service connection. work requires push under roadway on orchard st. sw to back side of property. habitat for humanity per email (attached) will be responsible for sidewalk replacement if required on both sides of orchard
Install an 8-inch d.i. water main stub at gravelly lake dr sw & lake steilacoom dr sw approx. 20 lf of pipe or to the limit of the sity's paving of gravelly lake dr in 2018. see attached map
New right of way permit request to install new fire hydrant across 40th ave in city right of way. work requires open cut roadway both sides of 40th ave in city right of way at the south end of frontage of property at the above address
Emergency permit request to repair broken 12 water main. work requires roadway excavation on the east side of union ave at 14413 union ave to make repairs
No charge permit work requires lwd to relocate and lower existing utility because of conflicts with the city new storm drainage system in the intersection of gld and mt. tacoma drive. in front of american credit union west of intersection on mt. tacoma drive. work to take place during the city contractor traffic control plan and possibly night work
New row permit request to install two water main extension on south tacoma way and 86th st south for a water main loop through the lee medical. the extension on s. tacoma way requires a lane patch and sidewalk replacement. the extension on 86th street requires just shoulder work. no pavement cutting
Permit request to install new water main extension for the new tillicum north project. work requires excavating 6'x6 area in the city roadway and removal of a 10'x6 section of city sidewalk on commercial ave. to abandon two existing water service connections also in the roadway. requires 4'x4 patch on commercial in city row
Sylvan park water main replacement phase 2. install approximately 3,700 lf of 8" pvc water mains including appurtenances to replace old ac mains in sylvan park. work to occur on gayle ave s, 89th st s, 90th st s, 91st st s, and sylvia blvd s.
Permit request to install 8 water main connection for the welcher building gun shop and range. work requires removal of a section of existing sidewalk in new frontage improvement. owner or contractor is responsible for sidewalk replacement
Abandon existing long service connection and relocate on the shoulder on the westside of gravelly lake drive sw. work requires excavaton on the shoulder of gravelly lake drive. across from 12601 gravelly lake drive. no pavement cutting
Relocate lakewood water district utilities along gravelly lake drive. city roadway improvement project from 59th ave to steilacoom blvd; both sides of roadway. work to take place inside city contractor traffic control setup.
New water service for starbucks tillicum. lwd 12 water main under city sidewalk along the frontage of the new starbucks. starbucks will remove section of sidewalk at service location and replace it during construction
New row permit request to install two water main extension across farwest drive sw. work requires open road excavation across farwest drive and sidewalk removal on the west side (and possibly east side)
Permit request to install new water service connection. work requires removal of a section of city sidewalk over water main along the frontage to excavate water main to provide serving behind sidewalk in right of way. (for future harbor freight tools)
Permit request to install water main extension 4 fire hydrants and an 8 fire line connection. work requires open cut road crossings. two crossings on 150th street three crossings on spring street two crossings on 146th street and some windows over the water main in pavement shoulder on spring st. in front of woodbrook jr. high to abandon existing services
New permit request to install new water service across 111th st sw work requires a push under roadway on the south side and open cut the north side of 111th st sw over utilities. developer will be responsible for permanent patching the north side of 111th st in frontage improvements
Emergency permit request to repair broken service line in city roadway in front of 11022 dean ct. sw work requires excavation in the city roadway down to service line to make repairs. the city right of way department was notified of emergency on friday august 11/2017 the same day the repair took place
Corner of 107th ave sw and 102nd st s. new water main installation for the walker main development. work requires excavation in city row on the shoulder of 102nd st sw. no pavement cutting required
BuildZoom verified this license was active as of March 2026.
Verify this license's status for Lakewood Plumbing Inc at the The City of Tukwila, WA.
This is a sample of licensing data; click here to access a complete history.
Verified License
License #
LAKEWCG926CG
Status
Active
State
Washington
Type
Construction Contractor, Construction Contractor
Business Type
Corporation
BuildZoom verified this license was active as of May 2026.
Verify this license's status for Lakewood Plumbing Inc at the Washington State Department of Labor & Industries.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
LAKEWPI099MA
Status
Inactive
City
Tukwila
Type
Construction Contractor, Plumbing
Class
Corporation
Business Type
Corporation
According to the The City of Tukwila, WA, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Lakewood Plumbing Inc at the The City of Tukwila, WA.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
LAKEWPI099MA
Status
Inactive
State
Washington
Type
Construction Contractor, Construction Contractor
Business Type
Corporation
According to the Washington State Department of Labor & Industries, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Lakewood Plumbing Inc at the Washington State Department of Labor & Industries.
This is a sample of licensing data; click here to access a complete history.