Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
P.O. BOX 393, Stilwell, KS, 66085
Use our bidding system to request a quote

Miller Plumbingco Inc

Miller Plumbingco Inc, Stilwell, Po Box 393, STILWELL, MO (Owned by: Carrie Kreiser,Leann Miller,Chris Boehm,Daleen Scott) holds a Plumbing Contractor license and 4 other licenses according to the Kansas City license board.

Their BuildZoom score of 107 ranks in the top 6% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Miller Plumbingco Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Miller Plumbingco Inc Contact Information

Phone: (913) 851-1333 Edit
Address: P.O. BOX 393, STILWELL, MO 66085 Edit

Miller Plumbingco Inc STILWELL

Quality

107
94th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Miller Plumbingco Inc has a BuildZoom score of 107, which places them above 94% of 23,328 contractors in Missouri.

Activity

60 projects
2025
118 projects
2024
210 projects
2023
Our building permit records indicate that Miller Plumbingco Inc has worked on at least 388.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

88 projects
New Constructions
4 projects
Home Additions
306 projects
Plumbing projects
135 projects
Sewer laterals
Analyzing permits over the last 4 years shows that Miller Plumbingco Inc mostly works on plumbing project and sewer lateral projects.

Pricing

9 projects
< $5k
5 projects
$100k-$250k
1 project
$250k-$500k
Value Not Public: 302.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Miller Plumbingco Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2024-06-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-02479
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-25
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01997
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-17
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01862
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-06-20
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01341
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-29
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01088
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Building permit - residential
2025-04-07
No final permit closed/voided house had a fire but mostly smoke damage caused the house to be gutted. house needs all new hvac system. new electrical in kitchen half bathroom pantry laundry room master bed master bathroom with all new fixtures. new plumbing in kitchen half bathroom laundry room and master bathroom with new fixtures. no structural
Valuation:
N/A
Permit #:
PRRES20240724
Status:
final
Fee:
$153
Permit Type:
Alteration single...
Building Type:
N/A
Excavation for water pipeline
2024-02-01
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00383
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-08-04
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02911
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-09-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02734
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-07-07
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02719
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-07-31
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02578
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-15
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02450
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-07-07
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02419
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-27
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02386
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-11-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02356
Status:
expired
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-11-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02354
Status:
expired
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-20
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01578
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-20
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01554
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-14
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01137
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-14
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01096
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # LIC-05-24-0049
126
BZ Score
-
Avg Project
-
Projects

Miller Plumbingco Inc Reviews

BuildZoom hasn't received any reviews for Miller Plumbingco Inc. Click here to be alerted when reviews are posted about them.
Please write a review about Miller Plumbingco Inc
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.