Minder Plumbing, Inc

Minder Plumbing, Inc, 101 James St, Smithville, MO (Employees: Oliver, Sherry, Timothy J. Minder, and Tyler James Minder) holds a Contractor / Craftsmen License license and 3 other licenses according to the Missouri license board.

Their BuildZoom score of 107 ranks in the top 6% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Minder Plumbing, Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Minder Plumbing, Inc Contact Information

Phone: (816) 863-4908 Edit
Address: 101 JAMES St, Smithville, MO 64089 Edit

Minder Plumbing, Inc Smithville

Quality

107
94th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Minder Plumbing, Inc has a BuildZoom score of 107, which places them above 94% of 23,328 contractors in Missouri.

Activity

152 projects
2025
204 projects
2024
240 projects
2023
Our building permit records indicate that Minder Plumbing, Inc has worked on at least 596.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

12 projects
New Constructions
412 projects
Plumbing projects
341 projects
Sewer laterals
Analyzing permits over the last 4 years shows that Minder Plumbing, Inc mostly works on plumbing project and sewer lateral projects.

Pricing

39 projects
< $5k
3 projects
$250k-$500k
Value Not Public: 409.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Minder Plumbing, Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-07-09
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02888
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-23
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02473
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-23
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02471
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-23
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02453
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-15
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02334
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-19
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02166
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-16
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02081
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-06
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01793
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-18
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01758
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-04-23
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01727
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01726
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-04-14
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01490
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-28
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01289
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-06
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
$0
Permit #:
PW-EXC-2025-00941
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-21
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00940
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-24
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00939
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-24
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00938
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-21
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00937
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-05-09
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00453
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-11
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00578
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # TC-0230
126
BZ Score
-
Avg Project
-
Projects

Minder Plumbing, Inc Reviews

BuildZoom hasn't received any reviews for Minder Plumbing, Inc. Click here to be alerted when reviews are posted about them.
Please write a review about Minder Plumbing, Inc
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.