Share your project details and we'll reach out to
Nelson T Lewis Construction Co Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Nelson T Lewis Construction Co Inc, Dublin, Po Box 2885, Dublin, CA (Employees: Geoffrey Swenson Massa, Nancy Lewis, and Thomas Dean Lewis) holds a General Building license according to the California license board.
Their BuildZoom score of 107 ranks in the top 6% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Nelson T Lewis Construction Co Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Unit 416. remove kitchen and vanity cabinets replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind
Unit 715. remove kitchen and vanity cabinets replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind
Unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) electrical panel to be replaced w/new 125 amp panel install new plumbing fixutres and ceramic tile. no walls moved
#646. remove (e) kitchen and vanity cabinets replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving 2.5 bathroom remodel in kind kitchen remodel in kind. existing accessibilty features to be maintained
#531. remove (e) kitchen and vanity cabinets replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving one bathroom remodel in kind kitchen remodel in kind. accessibility features to be maintained
Unit 931 - remove kitchen and vanity cabinets replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving
Unit #1023: remove kitchen & vanity cabinets replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls moving
Unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bathroom remodel in kind. remodel kitchen in kind
Unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bathroom remodel in kind. remodel kitchen in kind
Apartment #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall moving
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit work includes case work finishes and fixtures. remove one kitchenette no working in remaining kitchenette or bathroom. no exterior work
Unit 528- remove kitchen and vanity cabinets replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout change
11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction
4th floor: apartment #424: remove and replace in kind kitchen cabinets. extg electrical panel replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain)
1/f unit# 103: remodel and expansion of existing bathroom remodel existing closet and cosmetic renovations of living area. work includes new lights casework finishes and fixtures. interior work only. (unit sqft does not change no chnage in e occup struc or building area)
1/f unit# 113: remodel and expansion of existing bathroom remodel existing closet and cosmetic renovations of living area. work includes new lights casework finishes and fixtures. interior work only. (unit sqft does not change no chnage in e occup struc or building area)
1/f unit# 103: remodel and expansion of existing bathroom remodel existing closet and cosmetic renovations of living area. work includes new lights casework finishes and fixtures. interior work only. (unit sqft does not change no chnage in e occup struc or building area)
8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bathroom vantiies in kind. replace ceramic tile. replace plumbing fixtures and addition (n) 125amp subpanel no change to original floor plan layout
10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel install new tile and plumbing fixtures at restroom (no walls are moving)
Unit 423: remodel of (e) independent living unit into a laundry room. (n) lighting casewood finishes fixtures washing machine plumbing connections. electrical dryer power receptacles & exhaust ducts through the roof