New one-story commercial building slab on grade with footings; wood framed structure. requires foundation rough masonry above ceiling final and occupancy inspections. prior to building inspections please have all appropriate trade inspections completed and approved
Permit Type:
Commercial new
Neighborhood commercial remodel business tenant space remodel type ii-b existing foundation gas michigan building code - mi 2000 narrative: tenant space remodel-gb periodontal assoc. - please have all narrative: appropriate trade inspections approved before required building insps. narrative: contractor responsible to obtain req'd abv ceiling rough and final
Permit Type:
Commercial altera...
New 2-story commercial buildng (shell phase) mixed use (unseparated occupancy); business/mercantile type ii-b construction ***** building includes elevator****
Permit Type:
Commercial new
Building out for family orthopedic (first floor only) requires rough underslab above ceiling insulation and final inspections prior to occupancy
Permit Type:
Commercial altera...
Foundation only for 8121 trillium building j: contractor responsible to obtain all required inspections. requires trench footing and final inspections
Permit Type:
Commercial new
Shelly only for building c. requires footing rough underslab masonry and final inspections prior to occupancy
Permit Type:
Commercial new
Neighborhood commercial remodel business tenant space remodel type ii-b existing foundation gas michigan building code - mi 2000 narrative: provide fire rated ceiling in commercial building storage room/ste 19. narrative: requires rough and final inspections. prior to building inspections narrative: please have all appropriate trade inspections completed and approved
Permit Type:
Commercial altera...
Trillium circle - building k security federal credit union 4726 sf x 6/1000 = 2.84 = 3 reus reus from demolished buildings balance = 18 water reus - 25 sewer reus (does not include 2 for colony market) final meter size(s) tbd additional fee for larger than 1 tap water district = 2 -- sewer district = 7
Permit for one story building shell. requires trench footing rough underslab and final inspections
Permit Type:
Commercial new
Permits for one story building shell. requires trench footing underslab rough and final inspections
Permit Type:
Commercial new
Permit for buffalo wind wings building c shell with oark mcpherson design & construction inc. as contractor: >new construction fire prevention permit for the following automatic fire suppression system(s): >>water riser with 62 heads
Permit Type:
Fire prevention
Shell only - 2 reus - 1 reu for bww - 1 reu for retail tenant final reus to be determined with tenant space building out ccif paid at gcww meter size(s) and mxu tbd includes 1 water tap - additional fee for larger than 1 tap
Permit for trillium building j with park mcphearson design and construction inc. as contractor: >new construction fire prevention permit for the following automatic fire suppression system(s): >>water riser system with 80 heads
Permit Type:
Fire prevention
Permit for 8036 n. holly road: >demolish existing building(s) on-site >>starting date: spring 2008 completion date: summer 2008 contractor responsible to obtain all required inspections. requires backfill and final inspections
Permit for trillium building c shell with park mcpherson design & construction inc. as contractor: >new construction fire prevention permit for the following system(s): >>fire alarm system with seven (7) devices
Permit Type:
Fire prevention
Permit for allstate insurance company with park mcpherson design & construction as contractor: >new construction permit for the following automatic fire suppression system: >>water ruser with nine (9) heads
Permit Type:
Fire prevention
10, 692 sf office = 7 reus 4 tenant spaces = 4 preliminary reus final meter sizes(s) tbd 9/28/06 goyette paid for 2 meter merill lynch project ***7/31/08 - request for refund of tap fees -- using demolished reus not previously credited. balance after refund - 14 sewer reus & 7 water reus
Permit for the repair of water damage for suite 17 sonrise homes. contractor is responsible to obtain all required inspections. requires rough above ceiling and final inspections
Permit Type:
Commercial altera...
Didive portion of suite into suite for insurance company.requires rough above ceiling insulation and final inspections
Permit Type:
Commercial altera...
Staged/sequential demolition of commercial building. requires final inspection upon completion