×

Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Headquarters Address
3019 HOLLINWELL DRIVE, Katy, TX, 77450
Local address
Kansas City, MO, 64108
Use our bidding system to request a quote

Permit Service Plumber

Permit Service, (Owned by: Kent Fahey) holds a license and 2 other licenses according to the Richmond Heights license board.

Their BuildZoom score of 107 ranks in the top 6% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Permit Service, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Permit Service Contact Information

Phone: (281) 579-2226 Edit

Permit Service

Quality

107
94th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Permit Service has a BuildZoom score of 107, which places them above 94% of 23,328 contractors in Missouri.

Activity

28 projects
2026
2087 projects
2025
980 projects
2024
42 projects
2023
Our building permit records indicate that Permit Service has worked on at least 3137.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

23 projects
Commercial Renovations
11 projects
New Constructions
3 projects
Home Additions
1560 projects
Plumbing projects
1387 projects
Sewer laterals
Analyzing permits over the last 4 years shows that Permit Service mostly works on plumbing project and sewer lateral projects.

Pricing

422 projects
< $5k
1 project
$250k-$500k
Value Not Public: 2341.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Permit Service

Sort by: Notable Notable | Date Date | Job Value Job Value
Commercial certificate of occupancy
2024-10-30
Construct new single-family dwelling per master plan 201610234 with unfinished basement and 10 x 12 covered deck.plans reviewed for code compliance. permit to include public sidewalk and drive approach
Valuation:
$280,000
Permit #:
CICO-2024-01316
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-28
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03124
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-06
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03108
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-03
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03109
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-02
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02957
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02981
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-28
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02978
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-06-26
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02977
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-24
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02976
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02972
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02958
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-22
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02895
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-09
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02888
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-24
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02887
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-23
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02885
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02845
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02843
Status:
issued
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02840
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02835
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02828
Status:
issued
Fee:
$200
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # LIC-05-24-0049
126
BZ Score
-
Avg Project
-
Projects

Permit Service Reviews

BuildZoom hasn't received any reviews for Permit Service. Click here to be alerted when reviews are posted about them.
Please write a review about Permit Service
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.