Address
1416 Rosemead Ct, Modesto, CA, 95350
Use our bidding system to request a quote

Sagebrush Cable Engineering

Sagebrush Cable Engineering has quickly become well-known for their innovative and versatile services along with competitive prices. With more than 35 years of experience in the communications industry, Sagebrush Cable Engineering can help a company or municipality stay competitive in the rapidly changing world of technology. They offer a wide range of services including traffic control design, OSP/ISP design, fiber-to-the-home, make-ready/wind loading, GO95/NESC engineering , Rule 20 aerial and underground, relocation project designs, and all facets of permitting with city, county, and state agencies.

From BuildZoom:

Sagebrush Cable Engineering at 1416 Rosemead Ct, Modesto, CA 95350, has a BuildZoom score of 0 and ranks in the top 99% of 336,931 California contractors.

If you are thinking of hiring Sagebrush Cable Engineering, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Sagebrush Cable Engineering Contact Information

Phone: (209) 327-8365
Address: 1416 Rosemead Ct, Modesto, CA 95350

Sagebrush Cable Engineering Modesto

Quality

Alert*
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
*No active license on file. If you are Sagebrush Cable Engineering, log in and update your license info in the “Edit Profile” tab.

Activity

1 project
2025
1 project
2024
1 project
2023
Our building permit records indicate that Sagebrush Cable Engineering has worked on at least 3.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Pricing

Value Not Public: 2.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Sagebrush Cable Engineering Reviews
5 out of 5 stars, based on 2 reviews

  • August 14, 2014

    An outstanding company to do business with.

  • By R.thomas
    January 18, 2012

    One of the best field engineers ever

Please write a review about Sagebrush Cable Engineering
1 Rate this engineer
Click stars to rate
2 Provide a detailed review of this engineer.


Building Permits by Sagebrush Cable Engineering

Sort by: Notable Notable | Date Date | Job Value Job Value
Encroachment permit
2024-08-02
Zayo to place 1 (4") conduit from (e) zayo mh (approx 10 to property conduit)
Valuation:
N/A
Permit #:
ENC-23-0649
Status:
final
Fee:
$1,500
Permit Type:
N/A
Building Type:
N/A
Master encroachment agreement plan review
Valuation:
N/A
Permit #:
E22-0862
Status:
issued
Fee:
$11,924
Permit Type:
Dig once
Building Type:
N/A
Encroachment permit
2019-09-10
Plce 2 1.25"hdpe trench place cndts place duct
Valuation:
N/A
Permit #:
ENCR19-03974
Status:
final
Fee:
$151
Permit Type:
N/A
Building Type:
N/A
Encroachment
2020-02-24
Encroachment permit - place hdpe 2” conduit directional bo
Valuation:
N/A
Permit #:
238-17-EP
Status:
final
Fee:
$493
Permit Type:
N/A
Building Type:
N/A
Encroachment permit
2023-06-16
Zayo group service to 81 blue ravine rd
Valuation:
$5,000
Permit #:
ENCR22-02675
Status:
issued
Fee:
$151
Permit Type:
Utilities encroac...
Building Type:
N/A
Building Permit
2015-09-28
Zayo to (n) core out of (e) at&t mh 73-44-1. directionalbore thru 5 temp bore pits place (2) 30"x48
Valuation:
$0
Permit #:
375
Status:
ISSUED
Fee:
$164
Permit Type:
N/A
Building Type:
N/A
Encroachment permit
2019-09-10
No Description Available
Valuation:
N/A
Permit #:
ENCR19-03974-0
Status:
complete
Fee:
N/A
Permit Type:
Encroachment permit
Building Type:
General industria...
Pw utl main w trench
2019-12-16
Aerial and new building construciton. traffic control
Valuation:
N/A
Permit #:
APW16-00013
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Twin dolphin dr. & redwood shores pkwy- cable splicing work
Valuation:
N/A
Permit #:
CP12-0122
Status:
final
Fee:
$800
Permit Type:
U.g. Utilities
Building Type:
N/A
Construction permits
2016-04-11
Spring&2nd ave-abovenet-access at&t manhole
Valuation:
N/A
Permit #:
CP12-0162
Status:
final
Fee:
$800
Permit Type:
U.g. Utilities
Building Type:
N/A
Construction permits
2017-05-23
1068 washington re dive (e) manholes for conduit-
Valuation:
N/A
Permit #:
CP15-0027
Status:
final
Fee:
$800
Permit Type:
U.g. Utilities
Building Type:
N/A
Encroachment-minor
2015-09-28
Zayo to (n) core out of (e) at&t mh 73-44-1. directionalbore thru 5 temp bore pits place (2) 30"x48"x30 splice box
Valuation:
N/A
Permit #:
375
Status:
issued
Fee:
$164
Permit Type:
Encroachment - minor
Building Type:
N/A
Place new sb place 2 1.25 conduit
Valuation:
N/A
Permit #:
E19-0204
Status:
applied
Fee:
$1,255
Permit Type:
N/A
Building Type:
N/A
Encroachment
2025-12-10
Traffic control (vzws406552ca-mtnvtcsb40los)
Valuation:
N/A
Permit #:
E25-00327
Status:
filed
Fee:
$1,280
Permit Type:
N/A
Building Type:
N/A