Share your project details and we'll reach out to
Sl Coley
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Sl Coley at 777 Mill Creek Rd SW, Rocky Face, GA 30740, held a General Contractor license (#EN000561) with the Georgia contractors license board with an expiration date of 06-30-1986. We last verified the license was expired on 08-17-2022.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 84,062 Georgia contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Expansion of existing tenant. expansion space to receive exposed ceiling new lighting building standard finishes power/communication. existing space to remain as is. new plumbing locations in expansion area
Hanover house condo-15c: interior renovation including realignment of selective walls installation of a new kitchen casework and appliances redecorating bathrooms closet casework adding limited electrical outlets & light fixtures
Crown plaza hotel-site work: entry of plaza. new pavers over existing concrete drive eliminate curves to improve ada access. upgrade lighting wall and ceiling finishes. remove planters from sidewalk
Interior demolish of existing and demising partiitions plumbing and electrical locations and all associated components within existing demised suite to whitebox condition. suite will remain unoccupied
Interior demolition of demising partiitions (non-load bearing) plumbing and electrical locations. all associated components on this floor to remain as a whitebox condition
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers. 18th floor
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers. 14th floor
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers. 16th floor
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers. 15th floor
The work includes a renovation of the existing guestroom on 14th-18th floors and a renovation of sedlet existing guestooms on the 19th floor. the existing guestrooms will receive new finishes the vanities will be replaced the existing showers will be removed and the existing bathtubs will be converted to showers. 17th floor
Renovation of 13 existing units and common area spaces to conform to federal accessibility standards. exterior curb and sidewalk/ramp work for ada compliance. to include restriping
Pq corporation: interior alterations of second generation tenant space generic tenant buildout and building standard finishes minor hvac and electrical. trade permits are to be secured separately
Interior alterations of second generation tenant space generic tenant buildout and building standard finishes minor hvac and electrical. trade permits are to be secured separately
Fried rogers goldberg llc: interior alterations of first generation tenant space with generic tenant build-out and building standard finishes. new plumbing location and construction of new demising partition. test and balance shall be conducted. light power and voice/data modifications are considerable
Interior alterations to existing space. addition new exterior steps ***note from asst. director a. carter*** okay to submit for interior and exterior work under one permit prior to sap approval in planning. permit is not to be issued until all required departments have been approved
According to the Georgia Department of Professional Licensing, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Sl Coley at the Georgia Department of Professional Licensing.
This is a sample of licensing data; click here to access a complete history.