Share your project details and we'll reach out to
Sunrift Electric LLC
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 110 ranks in the top 4% of 191,428 Florida licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Sunrift Electric LLC, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Ncrqd: modular 5 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 3 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 2 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 7 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 6 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 4 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
Ncrqd: modular 1 tup2504-0173. new plans include connection to city water and sewer instead of well and septic. additionally we are adding fire suppression to the 7 modular homes. fire hydrants are included in the tup. working with the development department on the phased fsp. pln2505-0259 bayside community church
* remodel existing bathrooms to include demolish and install of new shower floor in master as well as new vanity. demolish existing tub shower in bathroom 1 and replace with new walk-in shower toilet and vanity. bathroom 1 and 2 to receive new switch to accommodate pocket door install
--storm damage -- remove and replace bottom 4 of drywall including insulation due to flooding during hurricane milton. remove and replace all finishes touched by water during the storm to include: lower kitchen cabinets vanities interior doors baseboard throughout shower and tub sliders and exterior doors. ***storm related - hurricane milton***
Residential swimming pool spa paver deck and footing ** pp aquatic inspections llc ** ** gas on separate permit** ***private plan review and inspections***
Meter and overhead riser change out install new grounding system install code required exterior disconnect convert existing main electrical panel to sub panel by separating neutrals and grounds install code required surge protection
Plans change - framing: typical partition wall detail showing new thickness of walls being changed to 3-5/8 thickness. this change is also shown on the floor plan. showing which walls this change applies to
Service change upgrade from 150a to 200a single phase replace existing meter can with new meter main install primary surge protection seperate neutrals and ground in existing main panel turned sub panel install new grounding system install new feeders from meter-main to sub panel
As per gas final inspection result: no approved gas on approved plans or gas drawing submitted need to submit revision showing isometrics material used drawing and manufactures specs for piping showing it can be installed outside. gas trade already added to the permit in a previous submittal
Convert overhead electrical service to underground install new meter main with grounding to meet 2020nec standards install new parallel 2 conduit provided by fpl from meter to fpl hand hole
Proposed construction of a sunroom on an existing slab foundation. the new addition will consist of wooden framing installation of roofing windows and minor electrical work to support lighting and basic power needs
Ncrqd: **pp/pr inspected.com** kitchen alteration - movement of current island drain hot cold water line aprox 18 accommodating new island position to comply with fbc by master plumber. all electrical work to comply with nec and fbc performed by licensed electrician. primary bathroom alteration - retrofitting of current built in bathtub to freestanding bathtub. movement of current s... see more
Riser and meter can replacement upgrade from existing 150a service to 200a 120v single phase provide and install new overhead riser service feeders meter can with disconnect surge protection and grounding system
Sunrift Electric did an outstanding job. They were efficient and were top-notch. I would recommend them to anyone needing 5 star electrical work.