2 heating eq 89.9. 2 heating eq 13.9. 3 heating eq 20.8. 2 heating eq 27.9. 2 heating eq 35.1. 3 heating equipment 41.3 4 cooling eq @ 1.5 ton. 2 cooling eq @ 1 ton. 2 cooling eq @ 2 ton. 3 cooling eq @ 2.5 ton. 3 cooling eq @ 3 ton. 2 cooling eq @ 7.5 tons. piping equipment. duct work floor 2 3
1676 International Dr, Mclean, VA
2019-05-23
Replace existing ductwork and install 10 new pieces of air conditioning equipment//amend to delete 1 electic unit heater and addition (2) heat pumps sjk 10/30/2019
Building Type:
Office building
13861 Sunrise Valley Dr, Herndon, VA
2021-03-24
Furnish and install new hvac equipment and all associated material
Building Type:
Office building
11830 Sunrise Valley Dr, Reston, VA
2019-01-11
Installation of grease duct and one -2 ton heat pump and 1 unit heater and relocate 1 air conditioning
Building Type:
Apartment/multi-f...
1 cooling equipment @ 3 tons. piping equipment. duct work floor p1
1 dishwasher. 1 floor drain/sink. 1 ice maker. 1 open site drain. 2 sink. floor 2 and 3
13861 Sunrise Valley Dr, Herndon, VA
2021-04-08
Furnish and install plumbing fixtures and all associated materials
Building Type:
Office building
4455 Brookfield Corporate Dr, Chantilly, VA
2020-06-16
Relocating existing kitchenette sink 4 feet and replacing electric water heater in ceiling
Building Type:
Office building
1850 Town Center Pw, Reston, VA
2021-07-01
Renovation of existing hospital space - 6 patient rooms and toilets
Building Type:
Hospital/urgent care
Installing (1) water closet (1) lavatory (1) shower (1) valve box (1) water heater- subject to field inspection
1676 International Dr, Mclean, VA
2019-05-23
Replace existing plumbing fixtures
Building Type:
Office building
11830 Sunrise Valley Dr, Reston, VA
2019-01-17
Installing gas pipe and piping for future connection
Building Type:
Apartment/multi-f...
Cooling eq: 2 - 30 tons ; piping; ductwork ** second 2nd. penthouse ****** air handling unit condensing unit (2) compressors (2) humidifiers (1) fan and associated duct work *** installation of air handling unit condensing unit and associated duct work renovations to relocate existing cystoscopy room and create a new operating room or-7. roof replacement at roofs above
2325 Dulles Corner Bv, Herndon, VA
2016-07-27
New hvac mechanical sytem comprising of 11 new air conditioning units 1 duct heater 1 exhaust fan ductwork
Building Type:
Office building
2 backflow preventer 22 drinking fountain 30 hose bib/wall hydrant 152 lava 255 roof/surface garage drain 40 shower 1 142 sink 2 sump pump 42 urinal 129 water closet 1 building sewer 1 water service 1 fire service 2 sewer pump 5 gas kitchen app 5 gas heating app 3 gas water heater 48 lab gas outlets=listed as gas heating app
1300 17th St N, VA
2013-02-13
1 drinking fountain, 2 floor drain/sink, 2 hose bib/wall hydrant, 2 lavatory/sink, 8 roof surface drain, 1 urinal, 4 water closet renovation to roof terrace (2950sf) to include new penthouse lobby/restroom add'n (1150sf) special inspections required
800 N Glebe Rd, VA
2011-03-09
Amended on 03/15/2011: + 01 water service. ** 03 backflow prev., 43 cleanouts, 19 drinking fountains, 43 floor drain/sinks, 24 hose bibs, 76 lav., 05 open site drains, 97 roof /surface/garage drains, 06 showers, 18 urinals, 58 water closets, 03 electric water heaters, 01 bld. sewer, 01 drain/vent, 58 water pipes, 01 sewage pump. re; b-0802705. *...edger 240-626-6311...neville 410-596-...
800 N Glebe Rd, VA
2011-04-21
9 heating=9, 410 mbh (total) 35 heating=527 mbh (total) 1 heating=2500 mbh 2 heating=188 mbh (total) 2 cooling=800 ton (total) 5 cooling=21 ton (total) 3 cooling=1275 ton (total) 2 cooling=20 ton (total) 1 fuel tank=381 gallons 02 expansion tanks=22gallon piping ductwork
2=backflow preventor 2=bathroom group 23=cleanout 2=drinking fountain 70=floor drain/sink 1=hosebib/wall hydrant 5=open site drain 31=roof/surface/garage drain 15=shower 4=sink 2=sump pump 26=urinal 55=water closet 1=build sewer 1=drain vent system 1=water service 2=gas water heater