×

Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
3567 BENTON ST SUITE 341, Santa Clara, CA, 95051
Use our bidding system to request a quote

VALLEY PROCESS SYSTEMS Plumber

Their BuildZoom score of 0 does not rank in the top 50% of California contractors.

If you are thinking of hiring VALLEY PROCESS SYSTEMS, INC, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

VALLEY PROCESS SYSTEMS, INC Contact Information

Phone: (408) 261-1277 Edit
Address: 3567 BENTON ST SUITE 341, Santa Clara, CA 95051 Edit

Building Permits by VALLEY PROCESS SYSTEMS, INC

Sort by: Notable Notable | Date Date | Job Value Job Value
Commercial/industrial
2014-04-16
Scope of work: mirra 8 equipment installation. 1. project scope of work – installation of an amat mirra 8 wafer polisher and an ontrak 8 wafer scrubber in an existing clean room. 2. trades – mechanical process piping electrical and structural (seismic bracing)
Valuation:
$83,162
Permit #:
2013 133497 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2013-04-10
Scope of work: addition (n) pvd & ald tool. installation includes electrical power mechanical exhaust and seismic bracing. (work being done under blanket hazmat permits for acid waste silane o2 nf3 nh3 h2 and inert gases under current plans)
Valuation:
$382,000
Permit #:
2013 102278 CI
Status:
issued
Fee:
N/A
Permit Type:
R & d lab
Building Type:
N/A
Commercial/industrial
2013-12-13
Scope of work: mirra 8 equipment installation. 1. project scope of work – installation of an amat mirra 8 wafer polisher and an ontrak 8 wafer scrubber in an existing clean room. 2. trades – mechanical process piping electrical and structural (seismic bracing)
Valuation:
N/A
Permit #:
2013 133100 CI
Status:
issued
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2011-07-27
Scope of work; the installation of bake-out oven #6 on the ground level of building 91. includes mep utilities hook-up and seismic anchorage. mechanical scope of work: removal of exhaust ducts and addition of 1 oven to 5 existing ovens. (n) exhaust duct for proposed oven processing cooling and water & process piping
Valuation:
$180,000
Permit #:
2011 023154 CI
Status:
complete
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2011-10-19
Scope of work; the installation of bake-out oven #6 on the ground level of building 91. includes mep utilities hook-up and seismic anchorage. mechanical scope of work: removal of exhaust ducts and addition of 1 oven to 5 existing ovens. (n) exhaust duct for proposed oven processing cooling and water & process piping
Valuation:
$180,000
Permit #:
2011 024825 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2010-08-26
The project involves the installation of three (3) bake-out oven tools on the lower level of b91. the installation includes mechanical, process piping and electrical hook-up, life safety devices, seismic tie-down of the ovens and replacement and relocation of nine (9) existing sprinkler heads. all work is inside the building, no exterior work.
Valuation:
$210,000
Permit #:
2010 020200 CI
Status:
Finaled
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Commercial/industrial
2011-04-12
The project involves the installation of six (6) aixtron epi reactor tools and support equipment at lower level basement. mechanical process piping and electrical utility hook-up is involved as well as life safety monitoring and structural tie-down of the equipment
Valuation:
$1,050,000
Permit #:
2010 027267 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2010-10-05
The project involves the installation of six (6) aixtron epi reactor tools and support equipment at lower level basement. mechanical process piping and electrical utility hook-up is involved as well as life safety monitoring and structural tie-down of the equipment
Valuation:
$1,050,000
Permit #:
2010 025904 CI
Status:
complete
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2011-10-07
900 sq ft work area near cols e/15. install vacuum chamber tool with various gas atmospheres. gas piping under 30 inch raised floor has auto sprinkler protection. two gas detector locations to be added. no changes to structure or exitways
Valuation:
$71,500
Permit #:
2011 030116 CI
Status:
final
Fee:
N/A
Permit Type:
R & d lab
Building Type:
N/A
Commercial/industrial
2013-02-28
Scope of work: installation of a new ssm module process gas piping, new gas cabinet and exhaust ductwork at bay 21. installation includes electrical power and seismic bracing. reconnect to (e) services
Valuation:
$80,000
Permit #:
2013 004295 CI
Status:
complete
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2013-05-16
Scope of work: installation of a new ssm module process gas piping, new gas cabinet and exhaust ductwork at bay 21. installation includes electrical power and seismic bracing. reconnect to (e) services
Valuation:
$80,000
Permit #:
2013 007132 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2011-08-03
Scope of work: installation of (n) manufacturing plasma chamber onto (e) tool ap-301. installation includes mechanical exhaust process piping and seismic bracing. plasma chamber electrical power feed will come from the (e) pdu installed under previously permitted tools. mechanical scope of work: install (3) exhausts process piping and (2) vacuum pumps
Valuation:
$38,000
Permit #:
2011 025612 CI
Status:
complete
Fee:
N/A
Permit Type:
R & d lab
Building Type:
N/A
Commercial/industrial
2011-10-07
Scope of work: installation of (n) manufacturing plasma chamber onto (e) tool ap-301. installation includes mechanical exhaust process piping and seismic bracing. plasma chamber electrical power feed will come from the (e) pdu installed under previously permitted tools. mechanical scope of work: install (3) exhausts process piping and (2) vacuum pumps
Valuation:
$38,000
Permit #:
2011 026857 CI
Status:
final
Fee:
N/A
Permit Type:
R & d lab
Building Type:
N/A
Commercial/industrial
2013-01-14
Scope of work: installation of a new manufacturing tool (ap-306) and associated mechanical exhaust process piping electrical power and seismic bracing. installation includes a new nh3 cabinet along with associated piping
Valuation:
$71,000
Permit #:
2011 031492 CI
Status:
final
Fee:
N/A
Permit Type:
R & d lab
Building Type:
N/A
Commercial/industrial
2008-11-18
Installation of four fume hood sinks. work includes the following: *mechanical exhaust connections * electrical installation to all 3 sinks *structural (seismic anchorage) of all 4 sinks and related equipment *installation of fire sprinklers and fire alarm integration *relocation of an eyewash-safety shower
Valuation:
$142,094
Permit #:
2008 021558 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2008-05-21
Installation of four fume hood sinks. work includes the following: *mechanical exhaust connections * electrical installation to all 3 sinks *structural (seismic anchorage) of all 4 sinks and related equipment *installation of fire sprinklers and fire alarm integration *relocation of an eyewash-safety shower
Valuation:
$142,094
Permit #:
2008 020370 CI
Status:
issued
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2010-10-21
Project description: installation of three (3) identical reactor tool sets and support equipment. includes mechanical process piping and electrical utility hook-up life safety monitoring and structural seismic tie-down. all work is interior to the building
Valuation:
$493,059
Permit #:
2010 018039 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2013-02-06
Scope of work: install 3 tools - plumbing printer & (2) fume hoods. includes electrical mechanical process piping hook-up and structural anchorage associated with the installation of said tools
Valuation:
$58,416
Permit #:
2012 032961 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A
Commercial/industrial
2011-10-19
Install sput02 tool. it only uses n2 ar for the process. pcw vacuum cda electrical and scrubbed exhaust from the vacuum pump. mechanical for one tool with process piping and one vacum pump with exhaust pump
Valuation:
$67,535
Permit #:
2011 024651 CI
Status:
final
Fee:
N/A
Permit Type:
Office
Building Type:
N/A
Commercial/industrial
2010-08-25
Installation of eight environmental chambers eight small chillers and eight control cabinets. includes mechanical process piping and electrical utility hook-up life safety monitoring and structural seismic tie-down. all work is interior to the building
Valuation:
$80,323
Permit #:
2010 012568 CI
Status:
final
Fee:
N/A
Permit Type:
Manufacturing
Building Type:
N/A

Similar Contractors See more

License # 652070
128
BZ Score
$23K
Avg Project
-
Projects
License # 1035495
142
BZ Score
$25K
Avg Project
-
Projects
License # 1037264
142
BZ Score
$6.5K
Avg Project
-
Projects

VALLEY PROCESS SYSTEMS, INC Reviews

BuildZoom hasn't received any reviews for VALLEY PROCESS SYSTEMS, INC. Click here to be alerted when reviews are posted about them.
Please write a review about VALLEY PROCESS SYSTEMS, INC
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.