Pierre marchebout; general repairs – scope of work to include: 1.remove & replace drywall at kitchen 2.remove & replace drywall at room above garage. 3.replace flooring as needed 4.frame new wall for offset at kitchen 5.relocate one door must comply with udc and irc (ibc) must comply with all applicable ncd standards must comply with historic coa as approved homeowner/contractor awar...
see more
Permit #:
REP-RRP-PMT-21-35300395
Pierre marchebout; general repairs – scope of work to include: 1.remove & replace drywall at kitchen 2.remove & replace drywall at room above garage. 3.replace flooring as needed 4.frame new wall for offset at kitchen 5.relocate one door must comply with udc and irc (ibc) must comply with all applicable ncd standards must comply with historic coa as approved homeowner/contractor awar...
see more
Permit #:
REP-MBR-APP21-35001191
Jose amaro; re-roof: no change to pitch removing existing shingles and replacing with same type no other work to be done all work must comply with the udc. materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of irc chapter 9 roof assemblies to include drip edge (905.2.8.5) and metal flashing as required by...
see more
Permit #:
REP-MBR-APP21-35009972
Jose amaro; general repairs – scope of work to include: fire damage to home 1.install new sheetrock throughout 2.install new siding 3.install insulation must comply with udc and irc (ibc) must comply with all applicable ncd standards must comply with historic coa as approved homeowner/contractor aware of inspections required what’s next handout issued.**cgarcia** **note: any electrica...
see more
Permit #:
REP-MBR-APP21-35010144
Re-roof: no change to pitch removing existing shingles and replacing with same type no other work to be done all work must comply with the udc. materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of irc chapter 9 roof assemblies to include drip edge (905.2.8.5) and metal flashing as required by code. **r. ...
see more
1. general repairs- to include replacement of sheetrock & insulation. **r. gabriel** ------------------------------------------------------------------------- 2. re-roof: no change to pitch removing existing shingles and replacing with same type no other work to be done all work must comply with the udc. **r. gabriel** materials and methods of application used for re-covering or repla...
see more
Jose amaro; general repairs – scope of work to include: fire damage to home 1.install new sheetrock throughout 2.install new siding 3.install insulation must comply with udc and irc (ibc) must comply with all applicable ncd standards must comply with historic coa as approved homeowner/contractor aware of inspections required what’s next handout issued.**cgarcia** **note: any electrica...
see more
Permit #:
REP-RRP-PMT-21-35303149
General repairs - scope of work to include: -- repairs due to fire damage (see case 170078) -- remove and replace drywall at master bedroom -- remove & replace 3 interior doors -- replacement of vanity in master bathroom and in bathroom 2 -- paint to finish & cosmetic repairs as needed must comply with udc and irc must comply with all applicable ncd standards must comply with histori...
see more
General repairs to include removal of 2 walls replacement of siding 9 doors & 8 windows in-kind. must comply with udc and irc contractor aware of inspections required whats next handout issued. **any electrical mechanical or plumbing work will require a separate additional permit by a state licensed contractor complete with inspections. ***all permits expire after 180 days with no act...
see more
07/07/14 general repairs remove and replace 3 fire damaged jack trusses/151 ft of 2x4 framing/replace and remover 320 sq ft of drywall/some roof patchwork being done where needed//some painting//hvac/elect will need to be permitted separately//ole'd to lb//ry
Interior remodel of an existing building office area for a new office. reuse existing walls and addition new restrooms. new parking lot layout and curb stops. *** refer to commodities letter ole on cofo 2107446 *** 01/16/19- customer notified permit is expired and requires a permit extension or cancel request. (mfrausto)*** ***02.01.2019 client informed all inspections and trade permi...
see more
** fire damage refer to case 96272 ** ok to issue permit with no plan review ** remove fire damaged rafters (no engineers letter required provided roof pitch will not change ** remove siding painting to interior and exterior ** to comply with udc and irc ** no other work to be done **
One story single family residence--75% fire damage plans required per case no 89429/included in the 1811sf is a 411sf addition. lot 12 block 17 ncb 12387. plat v 4700 p 137. zone r5. ud and energy report on file.***1/12/10--notified eddy e. stephen by email that plan is ready for pick up and the permit fee due is $594.43/arc***plan is in v bin*** 1/20/10 plans p/u by stephen eddu*agoe...
see more
New roof deck replace windows 3 smoke guard devices awnings and canopy 2 room ada upgrade --must secure approval for pedestrian protection devices and restricted public sidewalk/row before work 8'above sidewalk begins. no plumbing work indicated on plans. any new plumbing work will require additional plan submittals and plumbing permits...jh 12-22-04--electrical pe seal approved....vl...
see more
5% fire damage to existing single family residence repair only siding at fireplace no additions or structual changes to residence all work to comply w irc & udc no other work specified for residence due to fire damage ---2/15/08 not in flood plain can issue any or all permits to this residence verbal approval per steve cano @ 207-7722--
Addition 14x5=70sq.ft. patio with new concrete with cover attached to house, addition covered 10x20=200 patio to rear of home on new concrete slab attached to home, addition concrete sidwalk 32 ft. x 3ft=96sqft. from front driveway to rear of home. remove and repalce windows. must comply with udc irc codes not building over any easements and maintain setbacks
Past due letter sent 09/06/2010 fire damage @ 40%---gen repairs/windows/replacing interior walls siding to include reroof w/no change to pitch/remove & replacing roof trusses and shingles/repair drywall and paint int & extension and new flooring/sheetrock & insulation ** 08/31/10 blanca ahuyon @ 210-264-7313 checked list o.r.** miguel navarro 210-825-9522 8-31-10 pl
General repairs-car ran into house-reconstruct 2x4 exterior wall drywall rebuild exterior masonary wall rebuild masonary fireplace and chase repair 2-2x6 windows. no structural changes. must comply with udc & irc codes
Replace 16 ln ft of damaged extension wall and siding replace double 1 door all interior walls to comply with udc and irc codes/**mcf** 03/29/2013
Adding a new 20x13=260sq.ft. patio with new cement slab to rear of existing home must maintain setbacks not building over any easements, comply with udc, irc codes