Location
Address
PO Box 415, Creedmoor, NC, 27522
Use our bidding system to
request a quote
Wood Peace Construction Photos
Wood Peace Construction
Wood Peace Construction at PO Box 415, Creedmoor, NC 27522, has a BuildZoom score of 97 and ranks in the top 18% of 101,103 North Carolina contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Wood Peace Construction Services
Start a project today:
Multi-Room Remodel
Kitchen Remodel
Bathroom Remodel
Basement Remodel
Medium Multi-Family Remodel...
Other Residential Remodel
Office Renovation
Restaurant Renovation
Retail Renovation
Other Commercial Renovation
Decks and Porches
Doors and Windows
Framing
Wood Fences
Other Carpentry
Cabinets
Finish Carpentry
Wood Peace Construction Contact Information
Phone Number: (919) 818-5657
Address: PO Box 415, Creedmoor, NC 27522
Wood Peace Construction Reviews
4 out of 5 stars, based on
3
reviews
-
By Verified ClientSeptember 22, 2016kitchen remodeling project
-
By Robyn K.April 29, 2016
Bob was so great with getting in touch. I was not able to speak with him directly due to my client changing her mind about moving the garage, but I will keep his information for other projects! He had a great resume and site!
-
By AnonymousOctober 29, 2015
only chose one contractor to bid-already had an outside bid
Wood Peace Construction License info
License Not Required
| Status | Not Required |
| Type | GC - max project is only 30K |
| Business Type | Sole Proprietorship |
- BuildZoom verified in September, 2017 that this contractor does not need a license to be a contractor in North Carolina.
This is a sample of licensing data; click here to access a complete history.
97
BuildZoom Score
Insured
| Insurer | Erie Insurance Co. |
| Insured up to | $300,000 |
He is disorganized, unprofessional, and had significant gaps in his knowledge that he didn't recognize and that would have cost me a fortune to undo if I hadn't let him go early when I did.