rebuild cantalevered second stroy deck
The framing of a second-story cantilevered deck needs to be rebuilt. Previously repaired joists had been sistered due to dry rot but now rebuilding is necessary for about a 30-foot X 8-foot portion of the deck. Other framing areas of the deck appear sound but need inspection. Deck material will need replacing for the whole deck area. The current decking material is Trex.