1 - 25 of 102 experts
get quote
95.0 Total projects
Ep
get quote
274.0 Total projects
BML
get quote
Bernhard McC, LLC
BZ SCORE: 105
3.0 Home additions
31.0 Other projects
MRC
get quote
234.0 Total projects
DRE
get quote
3.0 New constructions
18.0 Mechanical projects
CS
get quote
38.0 Total projects
PMC
get quote
264.0 Total projects
PH
get quote
3.0 Hvac projects
585.0 Other projects
JMP
get quote
39.0 Total projects
Notable project: (No type. 3701 Richelieu St, Chalmette, LA, 70043). Residential
PMI
get quote
3.0 Total projects
BRL
get quote
9.0 Total projects
SEA
get quote
MAP
get quote
Marc Alan Pizzeck
BZ SCORE: 95
54.0 Total projects

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.

MAC
get quote
Notable project: (Calv - electrical low voltage permit. 5248 Hickory Hollow Pkwy, Antioch, TN, 37013). Rehab former dillard's at hickory hollow for nashville state community college antioch campus. ***pursuant to ordinance no 2008-1263 of the metropolitan code of laws i holder of this permit hereby certify that all construction and demolition waste generated by any and all activities governed... (more)
RRS
get quote
87.0 Total projects
FA
get quote
DH
get quote
3.0 Hvac projects
3.0 Mechanical projects
CP
get quote
HMI
get quote
Henry Mike Inc
BZ SCORE: 92
Notable project: (2101 Alamo Ave, Harvey, LA, 70058).
MA
get quote
Notable project: (Residential renovations. 1816 N Bengal Rd, Metairie, LA, 70003). Interior renovation kitchen cabinet electric, plumbing a/c heater, roof shingle replacement extended permit until november 30, 2014 - david cobb
JA
get quote
IH
get quote
BAC
get quote
MME
get quote
Notable project: (Commercial remodeling/renovations. 722 Martin Behrman Ave, Metairie, LA, 70005). Add one wall and pocket door. wall will have electrical.
DRL
get quote

Recent Work in Metairie

70006
Commercial
Three Old Split Systems Replacement
Proposal for converting from three old split systems to two new split systems at location after a walk through with owner. New duct work already in place but will need rework for two not three air handlers. For each of the two split systems: -Cooling capacity: 36,000-42,000 BTU (3-3.5 tons) -Heating capacity: ~20,000-25,000 BTU (Heat pump preferred) -SEER rating: Aim for 16-20 SEER -Moisture removal -Smart thermostat If you are interested in this project, please reach out. Thank you!

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.