Multi-Room Remodel
First, the work can't start until 6/1, when the tenants move out of the 1st floor apartment. The building is on the east side of Providence in a historic district. We are renovating a bathroom (probably enlarging it), a kitchen pantry, a closet, and peeling all the old plaster off the walls in 3 bedrooms. Upgrading wiring and plumbing. Truthfully, I have a plumber, a guy to do a demo, and an electrician. The demo guy is a good sheetrock. I need a carpenter...
Bathroom to the studs, strip adjoining bedroom walls of old plaster, replace plumbing (I have a plumber) upgrade wiring (I may have an electrician)
Pantry, which has the kitchen sink in it to studs; reframe the door to get a 24.5" counter on right side (up from 22"); replace the counter and old shelves with cabinets.
I'm working ...