Carlyle Plumbing, Inc, 120 Lodwick Ln, Excelsior Springs, MO (Employees: Carlyle, Troy, Troy Carlyle, and Troy Carlyle) holds a Contractor / Craftsmen License license and 2 other licenses according to the Missouri license board.

Their BuildZoom score of 89 does not rank in the top 50% of Missouri contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Carlyle Plumbing, Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Carlyle Plumbing, Inc Contact Information

Phone: (816) 792-8228 Edit
Address: 120 Lodwick Ln, Excelsior Springs, MO 64024 Edit

Carlyle Plumbing, Inc Excelsior Springs

Quality

89
30th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Carlyle Plumbing, Inc has a BuildZoom score of 89, which places them above 30% of 23,328 contractors in Missouri.

Activity

16 projects
2025
32 projects
2024
55 projects
2023
Our building permit records indicate that Carlyle Plumbing, Inc has worked on at least 103.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

56 projects
New Constructions
76 projects
Plumbing projects
50 projects
Sewer laterals
Analyzing permits over the last 4 years shows that Carlyle Plumbing, Inc mostly works on plumbing project and new construction projects.

Pricing

8 projects
< $5k
1 project
$50k-$100k
Value Not Public: 75.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Carlyle Plumbing, Inc Reviews
1 out of 5 stars, based on 1 review

  • By Scott M.
    April 26, 2024
    New construction

    Did the top rough for our new construction and wouldn’t show up to finish the job without any reason as to why. Our contractor left countless messages with no response. Would never recommend this plumber!!!

Please write a review about Carlyle Plumbing, Inc
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.


Building Permits by Carlyle Plumbing, Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-09-17
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02838
Status:
issued
Fee:
$343
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-17
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02838
Status:
issued
Fee:
$343
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-27
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01712
Status:
complete
Fee:
$334
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-11-14
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03180
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-11
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01768
Status:
issued
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-03-14
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01232
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-03-12
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01161
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-06-25
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00861
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-07-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01792
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-26
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01788
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-09
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01167
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-15
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01058
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-15
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01056
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-03-14
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01053
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00898
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-05820
Status:
complete
Fee:
$334
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-05819
Status:
complete
Fee:
$334
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-25
No traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. if two-way directional traffic flow cannot be maintained contractor shall obtain traffic control permit via compass kc for work in roadway prior to performing excavation work. install new 3/4 water service & 4 sanitary sewer for new single family residence
Valuation:
N/A
Permit #:
PW-EXC-2022-04786
Status:
complete
Fee:
$668
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-04651
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-04645
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # LIC-05-24-0049
126
BZ Score
-
Avg Project
-
Projects