Share your project details and we'll reach out to
Eric Jason Stewart
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 93 ranks in the top 27% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Eric Jason Stewart, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
>>as-built<< r3/u1: addition (122 sq ft) to enlarge/convert laundry room to new master bedroom suite w bathroom and w.i.c.; remodel (1) bathroom; change out (8) windows and (3) sliders like for like **there shall be no reduction of opening area in egress windows** remove and replace existing trellis (320 sq ft) {{as-built circa 2017}} >>com17-01160<< >>mhe17-00083<<
Torrey pines....proposed back up generator to an existing office building. new foundation foot-print to be 60 sq.ft. equiptment is 7 6 tall. zone is il-3-1. features: brush zones 300 coastal zone; coastal height limit; first public roadway; parking impact; sen.biologic resources mhpa 111 cen.tract-83.97
Torrey pines - building permit for interior tenant improvement to an existing office use. scope of work to include demolish new partition walls suspended ceilings 96 lf storage racks minor electrical lighting mechanical and plumbing. zone: il-3-1 overlays: chloz coastal-city 1st pub roadway pioz esl brush zone
University bldg permit for tenant improvement: walls, elec, mech, ceiling, plbg & add new exterior equipment room (700sf) to extg pharmaceutical bldg. pid 87-1049:census tract:83.17; property owner:cardinal health bc code:4373
Torrey pines - building permit for interior tenant improvement to an existing office use. scope of work to include demolish new partition walls suspended ceilings 96 lf storage racks minor electrical lighting mechanical and plumbing. zone: il-3-1 overlays: chloz coastal-city 1st pub roadway pioz esl brush zone
Torrey pines - building permit for interior tenant improvement to an existing office use. scope of work to include demolish new partition walls suspended ceilings 96 lf storage racks minor electrical lighting mechanical and plumbing. zone: il-3-1 overlays: chloz coastal-city 1st pub roadway pioz esl brush zone
Torrey pines - building permit for interior tenant improvement to an existing office use. scope of work to include demolish new partition walls suspended ceilings 96 lf storage racks minor electrical lighting mechanical and plumbing. zone: il-3-1 overlays: chloz coastal-city 1st pub roadway pioz esl brush zone
Torrey pines - building permit for interior tenant improvement to an existing office use. scope of work to include demolish new partition walls suspended ceilings 96 lf storage racks minor electrical lighting mechanical and plumbing. zone: il-3-1 overlays: chloz coastal-city 1st pub roadway pioz esl brush zone
Deferred sprinkler plan for approval 404157. *** "construction change -- building" approval scope includes "deferred approval for sprinkler plans for previously issued building permit approval #404157."