Share your project details and we'll reach out to
Fairfield Development Wa Lp
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 101 ranks in the top 12% of 128,670 Washington licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Fairfield Development Wa Lp, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Type: public works class: stand alone traffic control for work under lsm21-05890. arborist exploratory micro-excavation mandated by cok arborist prior to tree-cutting operation. all traffic lanes will be maintained. bike lane closure. flagging included. ne 120th st east of slater ave. approximately 200 ft from intersection project: slater mixed use (fairfield residential)
Type: public works class: stand alone 6/12/2025 tcp revised to allow day work 9 am - 3 pm traffic control for cok mandated tree removal lane expansion and restriping. for lsm21-05890. project: slater mixed use (fairfield residential)
Type: building mixed use class: new slater mixed use: new construction mixed use development. type ia construction only with at grade and underground parking. (90 apartment units) project: slater mixed use (fairfield residential)
Type: land surface modification class: non site development, , village @ totem lake (upper mall) phase ii: lsm for building a 850 unit apartment and commercial properties, , project: village at totem lake (phase ii)
Type: building mixed use class: new, , village @ totem lake (upper mall) podium: construction of above grade parking ground level retail restaurant uses and a cinema, , project: village at totem lake (phase ii)
Type: public works class: stand alone traffic control. installation of rope lighting along the top of the building on 120th avenue ne. this lighting is not an addition it is part of the approved project plans. the tcp for the work is broken into 2 parts
Type: land surface modification class: site development slater ave mixed use lsm: land development for 3 mixed-use commercial-residential buildings project: slater mixed use (fairfield residential)
Type: demolition class: demolition, , slater ave mixed use demo: demolish two existing structures and associated onsite utilities for the preparation of a new commercial redevelopment. public utilities will be rerouted under a separate permit prior to removal, , project: slater mixed use (fairfield residential)
Type: land surface modification class: non site development, , slater ave lsm- project will widen the existing driveway to better accommodate vehicle access on slater ave given the raised median, , project: slater mixed use (fairfield residential)
Type: tree class: removal and pruning *cancelled* tree removals will be processed as part of a post-rev for lsm21-05890. public tree permit: tree removal along row on ne 120th st
Type: land surface modification class: non site development, , village @ totem lake (phase ii) totem lake hillside park: widen existing 5 ft sidewalk along 120th ave ne fronting evergreen hospital to 10 ft wide and installing a small park along the frontage. (includes bno20-06080 for walls and stairs), , project: village at totem lake (phase ii)
Type: building not occupied class: new, , village @ totem lake (phase ii) totem lake hillside park (re: master permit lsm20-05124): install cmu walls at park along with stairs and other hardscape, , project: village at totem lake (phase ii)
Type: public works class: franchise utility/telecom row updated expiration date row permit to make sewer connection to northshore utility district sewer project: slater mixed use (fairfield residential)
Type: land surface modification class: non site development, , slater ave redevelopment lsm: minor grading for soil reclamation, , project: slater mixed use (fairfield residential)
Type: building not occupied class: new slater ave mu shoring - shoring plans and calculations a (mixed use new construction residential apartments) project: slater mixed use (fairfield residential)
Munew - bear creek apartments - type ia and type va construction - construction of three levels of type ia parking garage/amenity spaces/retail. construction of five stories of type va multi-family residential development containing 360 units. type ia consists of 144, 133 sf of s-2 parking garage occupancy 3, 444 sf of u occupancy 11, 386 sf of r-2 residential occupancy 5, 075 sf of b... see more
Terminate water meter no. 39963608 5/8"x3/4 commercial meter for demolish - bear creek mixed-use - demolish and removal of existing commercial structure to be split by the applicant and city of redmond per bla 20160603900011. removal of existing 1728 sf structure and foundation. cap existing utilities to the building. total area of work 1728 sf
Demolish - bear creek mixed use - demolish 6, 122 sf portion existing 6, 222 sf structure including underground utilities. (portion of building on parcel #9270700030 under permit bldg-2017-07299) area of work 6, 122 sf sf
West building. install new automatic sprinkler and standpipe systems for west tower and entire parking garage of new apartment complex in accordance with nfpa 13 and nfpa 14. 2845 heads.
Demolish - bear creek mixed use - demolish 100 sf portion of existing existing 6, 222 sf structure including underground utilities. (portion of building on parcel #9270700010 under permit bldg-2017-07298) area of work 100 sf sf
BuildZoom verified this license was active as of March 2026.
Verify this license's status for Fairfield Development Wa Lp at the The City of Tukwila, WA.
This is a sample of licensing data; click here to access a complete history.
Verified License
License #
FAIRFDW845LZ
Status
Active
State
Washington
Type
Construction Contractor, Construction Contractor
Business Type
Joint Venture, Limited Liability Company
BuildZoom verified this license was active as of June 2026.
Verify this license's status for Fairfield Development Wa Lp at the Washington State Department of Labor & Industries.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
FFDEVL*022LD
Status
Inactive
State
Washington
Type
Construction Contractor, Construction Contractor
Business Type
Joint Venture, Limited Liability Company
According to the Washington State Department of Labor & Industries, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Fairfield Development Wa Lp at the Washington State Department of Labor & Industries.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
FAIRVRW944ME
Status
Inactive
State
Washington
Type
Construction Contractor, Construction Contractor
Business Type
Joint Venture, Limited Liability Company
According to the Washington State Department of Labor & Industries, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Fairfield Development Wa Lp at the Washington State Department of Labor & Industries.
This is a sample of licensing data; click here to access a complete history.