Share your project details and we'll reach out to
Fletcher, Kalam
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Fletcher, Kalam at 4350 SE Hwy 42 Hwy, Summerfield, FL 34491, held a Roofer license (#) with the Florida contractors license board. We last verified the license was inactive on 06-07-2020.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 191,428 Florida contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Addtion on three sides & remodel12/5/07 pending- (need elevation certificate based on construction drawings pavers in setback)**revision #1 received (modify paver setbacks & addition flood vents) - 1/2/08 kdc****no paver drive on this permit***revision # 2 received - pile cap modification -
Addtion on three sides & remodel12/5/07 pending- (need elevation certificate based on construction drawings pavers in setback)**revision #1 received (modify paver setbacks & addition flood vents) - 1/2/08 kdc****no paver drive on this permit***revision # 2 received - pile cap modification -
Residential remodel replace air conditioning system install ada full bathroom install impact windows and doors **5/10/13 - rec'd rev#1 - change water supply pipes from copper to pvc.**mm *6/17/13 sitework permitted and paid for. lm* **6/25/13 - rec'd rev#2 - addition handicap parking space (concrete) & si
Residential remodel replace air conditioning system install ada full bathroom install impact windows and doors **5/10/13 - rec'd rev#1 - change water supply pipes from copper to pvc.**mm *6/17/13 sitework permitted and paid for. lm* **6/25/13 - rec'd rev#2 - addition handicap parking space (concrete) & si
Residential remodel replace air conditioning system install ada full bathroom install impact windows and doors **5/10/13 - rec'd rev#1 - change water supply pipes from copper to pvc.**mm *6/17/13 sitework permitted and paid for. lm* **6/25/13 - rec'd rev#2 - addition handicap parking space (concrete) & si
Interior renovation demolish (1) full bathroom addition (1) half-bath and install new central air system. **received rev #1 10/10/12 -cd** 1. install 10 recessed lights 2. reverse kitchen layout sink dishwasher & range on oppsite wall.3. install new 100 amp service panel in office with main di
Interior renovation tile all floors demolish & replace kitchen cabinets new vanity in guest bathroom **rec'vd sign on george's plumbing-cd-3/29/2012** **3/29/12- rev #1 rec'd - revision to addition mechanical/hvac to permit to addition another vent.**mm **rec'd sign on from dana's air conditioning 3/29/2012**dr
Structural concrete repair. **8/8/13 - rec'd rev #1-change rear stair stringer from poured concrete to wood 2x12 pt 16 o/c. (refer to item #7 on drawings).**mm *8/12/13 - pending per ben - need engineer to make change (signed & sealed).*lm **8/22/13 - rec'd engineering for rev #1.**mm
Room enclosure 12x30 -atf ** 10/13/11 project denied - does not meet setback. sent letter denying permit and requiring removal of addition 10/13/11 - kb/gg****project revised and resubmitted by owner - 11/15/11**** 11/17/2011 met on-site with ron george kalam (beacon). inspection of ove
Emergency kitchen repair due to fire damage **6/9/14 rev#1 - addition steve's plumbing to repair/replace supply & waste plumbing components to fire damaged kitchen 1.vent stack/sink drain 2. hot & cold supply to kitchen sink. - mm* ($500)
Interior renovation - remove wall air conditioning install 15k mini split air conditioning install fur strips to block walls install drywall to walls and ceiling up grade electrical install sub panel and recessed lighting in ceiling
Install on demand water heater. install triple basin sink. install hand wash sink. install electrical service for water heater and gfi as required by code. install frp panels to walls in food prep area-non porous surfaces
Install 5-v crimp metal roof with poly glass peel & stick underlayment. replace all fascia soffit & gable end siding with hardie fiber cement soffit fascia & gable siding panels. hardie component noa 13-0311-07
Skate park work**susie needs to see engineer letter when we receive 9/14/10 lm** do not issue permit without this letter rev #1 submitted 10/19/10 omit 2 ramps to be constructed at a later date. lmrev #2 submitted 02/03/11- construct mia style obstacle am
Shutter installation (6) - aluminum storm panel shutters to all openings that do not have adequate protection. *6/11/13 wally pending all highlights lm* *6/14/13 wally pending site specific engineering lm* *6/24/13 rec'd rev#1 - design pressures per wally's request and added additional shutter
Replace cast iron sewer line with pvc from guest bathroom (off kitchen) to street. demolish bathtub & partial bathroom floor to allow plumbing repairs. install new bathtub & tile floor
Concrete repairs per architectual repairs report**12/4/2014 rec'd rev# 1 - addition elite roof to rear of house appx. 3'x24 and screen in same over existing porch (72sf) ($2100.00)**ce
Remove and replace existing cast iron waste piping under slab for rear bathroom. cap and abandon existing cast iron and re-route with pvc out the rear of home and existing sewer
According to the Florida Department of Business & Professional Regulation, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
This is a sample of licensing data; click here to access a complete history.