×

We'll help you find the right contractor.

Share your project details and we'll reach out to JAMES SUNG KIM so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Get Started
Is this your business? Claim now >

Location and Projects

Address
23425 S VERMONT AVE B, Torrance, CA, 90502
Use our bidding system to request a quote

JAMES SUNG KIM Construction

JAMES SUNG KIM, 23425 S Vermont Ave, Torrance, CA (Owned by: Sung H Kim) holds a General Building license and 6 other licenses according to the California license board.

Their BuildZoom score of 99 ranks in the top 15% of 336,931 California licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring JAMES SUNG KIM, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

JAMES SUNG KIM Contact Information

Phone: (818) 246-5278 Edit
Address: 23425 S VERMONT AVE B, Torrance, CA 90502 Edit

JAMES SUNG KIM Torrance

Quality

99
85th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
JAMES SUNG KIM has a BuildZoom score of 99, which places them above 85% of 336,931 contractors in California.

Activity

5 projects
2025
7 projects
2023
Our building permit records indicate that JAMES SUNG KIM has worked on at least 12.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Pricing

1 project
< $5k
1 project
$5k-$20k
Value Not Public: 11.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by JAMES SUNG KIM

Sort by: Notable Notable | Date Date | Job Value Job Value
Permanent water - water upgrade
2023-01-30
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 12” cip and install n... see more
Valuation:
N/A
Permit #:
WAT-2023-0012
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2023-01-30
Trench/excavate per city standard 312 to hot tap existing 12” cip and install new 1” service and 1 domestic meter per city standard 601. abandon the existing 3/4 service at the main and return the old meter to the city per city standard 646. paving moratorium applies until 2/2025
Valuation:
N/A
Permit #:
ENG-2023-0049
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - backflow device
2023-01-23
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. install a 1 rp backflow assembly concrete pad and cage per city standard 604 an... see more
Valuation:
N/A
Permit #:
WAT-2023-0010
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2023-02-15
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2022-0110
Status:
expired
Fee:
$253
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2023-01-10
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2023-0002
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2023-01-09
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2023-0001
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2025-01-18
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2023-0013
Status:
expired
Fee:
$253
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2022-04-20
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 cip and install new... see more
Valuation:
N/A
Permit #:
WAT-2022-0024
Status:
complete
Fee:
$6,190
Permit Type:
N/A
Building Type:
N/A
Permanent water - backflow device
2022-10-31
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. install a 1 rp backflow assembly concrete pad and cage per city standard 604 an... see more
Valuation:
N/A
Permit #:
WAT-2022-0107
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2022-10-26
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 4 cip and install (4)... see more
Valuation:
N/A
Permit #:
WAT-2022-0104
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2022-10-26
Trench/excavate per city standard 312 to hot tap existing 4 cip and install (4) new 1 services and (4) 1 residential fire meters per city standard 601. abandon existing 3/4 service per city standard 646 and return old meter to the city. developer shall provide meters. coordinate inspection with pete acosta 714-932-9060
Valuation:
N/A
Permit #:
ENG-2022-0683
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2022-12-16
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 313 to hot tap existing 12 pvc and install ne... see more
Valuation:
N/A
Permit #:
WAT-2022-0118
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2022-12-16
Trench/excavate per city standard 313 to hot tap existing 12 pvc and install new 1 irrigation service and 1"meter per city standard 601. install (2) 1 rp backflow assemblies for domestic and irrigation services per city standard 604. traffic control per w.a.t.c.h. manual. work hours 8:30 am - 3:30 pm
Valuation:
N/A
Permit #:
ENG-2022-0812
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2022-08-11
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 8 pvc and install new... see more
Valuation:
N/A
Permit #:
WAT-2022-0080
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2022-08-03
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 8 pvc and install new... see more
Valuation:
N/A
Permit #:
WAT-2022-0072
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2025-09-23
All permit fees and/bonds must be paid and water permit issued prior to getting approval signatures from water engineering division. before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to added to the permit per water ... see more
Valuation:
$0
Permit #:
WAT-2022-0088
Status:
issued
Fee:
$362
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2022-08-29
Trench/excavate per city standard 312 to hot tap existing 4 c.i. and install new 1 service and 1 meter for new adu per city standard 601 and if determined by inspector upgrade existing 5/8 meter by installing a customer shut off valve and brass nipple to conform to current city standard 601. new meter is to be provided by the developer
Valuation:
N/A
Permit #:
ENG-2022-0555
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Single family (alteration/repair) - re-roof
2025-05-22
Tear off existing roofing and install class a shingles at 33 squares
Valuation:
$7,525
Permit #:
BD-2025-298289
Status:
final
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2022-11-21
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2022-0114
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2022-12-08
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. upgrade existing meter assembly per city standard 601 by installing a customer ... see more
Valuation:
N/A
Permit #:
WAT-2022-0117
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # 758563
177
BZ Score
$10K
Avg Project
-
Projects
License # 1072840
212
BZ Score
$40K
Avg Project
-
Projects
License # 1079863
191
BZ Score
$27.9K
Avg Project
-
Projects

JAMES SUNG KIM Reviews

BuildZoom hasn't received any reviews for JAMES SUNG KIM. Click here to be alerted when reviews are posted about them.
Please write a review about JAMES SUNG KIM
1 Rate this contractor
Click stars to rate
2 Provide a detailed review of this contractor.