Renovation of existing space to be converted into self storage facility. wall partitions floor finish paint direction of meps.approved by: jo/sv
Building Type:
Commercial
Partition spae for two tenants and buildout with paint floor finish and direct the mepscall experts & vacant spaceapproved by: jo/sv
Building Type:
Commercial
Mechanical hvac work. re-submit with journeyman license of the jobapprove kb/yc
Building Type:
Commercial
Demolish two pavilions widen entrance install billards and parking lot striping. p#1481/23.approved by cg jm
Building Type:
Commercial
Mechanical hvac work at cell experts and vacant spaceapproved kb/yc
Building Type:
Commercial
Ez interior demolition- for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans
For interior level 2 alterations to create two (2) separate tenant spaces as per plan. separate permits required for certificate of occupancies
Interior alterations to hvac system including registers and diffusers with associated duck work as per plan
Partition space for two tenants and building out with paint floor finish and direct the meps 2 tenants spaces (go puff & 3 rivers beer). p #63/21 & 116/21.approved by jo jm
Building Type:
Commercial
Barbelin hall 1st & 2nd floor bathrooms ez interior demolition- for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans
Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans
For increase in height of front and side (portion of side) facade elevation and partial demolition of existing metal canopy roofing and wood framing on an existing one story structure. size and location as shown on the application. for uses as previously approved on an existing multi tenant commercial complex in an existing structure.no sign on this permit. no change in area
For level iii alterations to an existing attached structure to include interior demolition alterations new front facade creation of a mezzanine (in lieu of a third floor) and accessibly upgrades. structure for use as a salon. separate permit required for plumbing electrical and mechanical. amended permit required to document special inspections. all work per approved plans
For the complete demolition of the front facade of an existing building on site (one (1)- three(3) story structure) as shown per approved plans and submitted documentation sealed by engineer. work must comply with code bulletin b-1032.if field conditions vary contact structural engineer prior to the start of any work. safety plan must be on site at all times
Facade nenovation of existing multi tenant commercial building to include the demolition of existing metal canopy roof and installation ofnew framing eifs veneer stone precast stone and concrete flatwork
Level ii interior alterations (no change of occupancy) for renovations to existing gymnasium facility (accessory to existing school) to create new toilet room areas as per approved plans. existing building not required to be sprinklered. *2018* **separate permits required for any mep work**
Permit Type:
Addition and/or a...
Ez interior demolition- for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. . structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls party walls floor/roof framing or f...
see more
Ez interior demolition- for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans
For level ii alterations to include the penetrations of a fire wall and lower existing joists to align floor elevation on the first floor level. separate permit required for fitout of tenant space. second and third floor are vacant see affadavit of restricted use. all work to be done per approved plans. separate permit required for all other work
Interior alterations to campion student center to convert office space into a student lounge on second floor as per approved plans. **asbestos removal required prior to start of work**
Stay away from this contractor. They don't pay their subcontractors and have a track record of short paying or not processing change orders.
He asks subs to fabricate normal charge backs into change orders so he can charge them to his customer so they won't come out of his own pocket or he won't have to hassle with charging back another subcontractor.
If there was a zero str rating, Chris Rohner and Phoenix Construction and Management would deserve it.
The most dishonest contractor I have encountered in 20+ years.