Share your project details and we'll reach out to
Stefin Companies Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Stefin Companies Inc, 7521 Suzi Ln, Westminster, CA (Employees: Margie Mireya Hunter, Mark Alan Hunter, and Timothy Edward Burke) holds a Electrical, General Building license according to the California license board.
Their BuildZoom score of 94 ranks in the top 24% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Stefin Companies Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Plan check for t24 only for tenant space me undies suite 2375 this scope is for tenant improvement portion core and shell was approved under permit# 17041-10000-40193. loads are added to the existing panelboard. all other equipments and some lightings are existing
Full plan check for first time tenant 7 for all mankind suite 1987 in westfield century city. install (1) new panel and (1) 75 kva xfrm. new lights and powers. total area: 1, 170 sq.ft
First floor room #100 replacing the old lighting with new and providing new power outlets per plan. (all panels and meters are existing 1, 250 sf ) in the basement room #01-replacing the old light fixtures with new and providing power outlets throughout per plan.(all panels and meters are existing 469 sf)
Changes to an approved set of plans. changes include connecting the em lighitng to the existing building generator. plan check for em and egress lighitng
1426 montana ave - service upgrade and relocation of subpanels. in unit 7 upgrading the existing 200 amp service panels to a new 400 amp service and new 400 amp sub-panels. in unit 8 relocating the 400 amp sub-panel taking it out of the restroom and relocating it to the adjacent room
Service upgrade and relocation of subpanels. in unit 7 upgrading the existing 200 amp service panels to a new 400 amp service and new 400 amp sub-panels. in unit 8 relocating the 400 amp sub-panel taking it out of the restroom and relocating it to the adjacent room
Change of use from retail shell space to new restaurant in (e) commercial highrise building. plan check for power and energy. building permit under 16016-10000-24941
Changes to an approved set of plans. changes include connecting the em lighitng to the existing building generator. plan check for em and egress lighitng
Renovation of 5000 sf of restaurant (daily grill) at westin lax. new power and lighting. epc: power and t24 energy efficiency standards. a variance to separate the electrical and life safety system plan check and approval was submitted on december 15 2008. permit was inssued on application # 08041-10000-21046 this plan is the as built version of the installation and is to be inspected
Renovation of 5000 sf of restaurant (daily grill) at westin lax. new power and lighting. epc: power and t24 energy efficiency standards. a variance to separate the electrical and life safety system plan check and approval was submitted on december 15 2008
Supplemental permit to collect fees for ___1_____(humber) additional inspections(s) per inspection noice#_u92037________or date________. this permit does ot authorize any additional work or extend the expiration date of the original permit
Comrcial block , wood ceiling 25000sqft, sub parking one story with roof top parking. new service. title 24. this is revision to application # 04041-10000-21084 20 new ckts and new title 24 ------52689 sqft conditioned area