Bathroom Remodel
Primary bath. Fill in sunken shower, relocate shower controls, install rainhead in ceiling and shower wand on wall, create new half wall along shower as shelf, new operable window in shower area.
New pony wall between shower/toilet w/glass above, and new shower door.
Replace floor-mount toilet with wall-mount style.
Move non-load bearing wall separating toilet from vanity over by 5", and install pocket door.
New overhead lighting, move some electrical switches and outlets.
Demo walk-in closet and raise dropped ceiling.
Install provided vanity/sink and linen cabinet.
Install provided tile in shower and floors.
see attached marked up photos:
red=structural, green=plumbing, blue=glass, yellow=window
If you're interested, please reach out. Thank you!